- Product
- 40 × Shelf unit
- Route
- Make to order
- Delivery
- Week 43
Know what it costs to make, before you quote it.
Bills of materials drive component demand, work orders track the floor, and every finished unit carries its real cost into stock and the ledger.
ManufacturingMO/0412 · 40 × Shelf unit
- Units done
- 26 / 40
- Quality checks
- 3 / 3
- Unit cost
- S$ 186.40
Journal entryMO/0412 · 40 unitsDr = Cr
- DrFinished goods7,456.00
- CrRaw materials4,744.00
- CrLabour and overhead2,712.00
- Bill of materials
- Work orders
- Real unit cost
First phase: Send us one product's BoM
Delivered by TechNext from Singapore, Taguig City and Ho Chi Minh City
Odoo for manufacturers, in one paragraph
Odoo for manufacturing connects bills of materials, work orders, the shop floor, quality checks, maintenance and purchasing to Inventory and Accounting, so every finished unit carries its real cost and every component can be traced back to its supplier.
From sales order to finished goods, costed.
How an order becomes a product in Odoo, and what each step replaces. Each step is a record you would see in Odoo.
-
Step 1 of 6, Order: Sales order in
A confirmed sales order reserves stock or triggers production, depending on the route you choose for the product: make to order or make to stock.
SO 0418Sales orderConfirmed
-
Step 2 of 6, Plan: Production planned on capacity
Manufacturing orders are scheduled against work center capacity, and the Master Production Schedule plans ahead from forecasts.
MO/0412Manufacturing orderPlanned
- Product
- 40 × Shelf unit
- Routing
- Cut, weld, paint
- Scheduled
- Week 42
-
Step 3 of 6, Source: Components bought on time
Missing components raise purchase orders from reordering rules or straight from the manufacturing order, using each vendor's lead time.
PO00377Purchase orderConfirmed
- Component
- 160 × Bracket
- Lead time
- 5 days
- Raised by
- MO/0412 shortage
-
Step 4 of 6, Make: The shop floor, on a tablet
Operators follow work orders on a tablet, record quantities with barcodes and log their time. With continuous production in Odoo 20, the next operation can start as soon as some units are ready.
Weld cell 2Work orderIn progress
- Done
- 26 of 40
- Operator
- Tablet, barcode scan
- Order
- MO/0412
-
Step 5 of 6, Check: Quality checks in the flow
Quality control points trigger checks at receipt, during operations or before delivery. Failed checks raise quality alerts for follow-up.
QC/0412Quality checkPassed
- Checks
- 3 of 3 passed
- Point
- After welding
- Order
- MO/0412
-
Step 6 of 6, Cost: The real cost of each order
Component, work center and extra costs roll up to each manufacturing order, and stock valuation posts to Accounting automatically.
MO/0412Order costingCosted
- Unit cost
- S$ 186.40
- Margin
- 25%
- Valued in
- Finished goods
Odoo for manufacturing: a multi-level BoM, costed and planned.
One product, three levels of bill of materials, the way TechNext models it in Odoo Manufacturing. Costs roll up from components and work-centre time to the unit cost; requirements explode down from demand to manufacturing orders, shortages and purchase orders. Press a component, move its price or scrap allowance, then switch to MRP and change the demand.Change a component's price and watch the cost of one product roll up.
- Manufactured (own BoM)
- Kit BoM
- Purchased component
- Short: purchase order raised
Demand
Manufacturing orders
Component shortages
Purchase orders
Structure: an office desk is made from a steel frame and a desk top, which are manufactured from their own bills of materials, and a fixing kit, a kit BoM of screws, cam locks and an Allen key.
Cost roll-up: each component's quantity times its cost, plus each operation's minutes at its work centre's cost per hour, adds up level by level to the desk's unit cost of S$ 116.40 in this sample.
Work centres: cutting, welding, painting, woodworking, assembly and packing, each with its minutes per unit and its load against the hours available this week.
MRP: demand from sales orders, less stock, becomes manufacturing orders for the desk and its sub-assemblies; components short of stock raise purchase orders to their vendors, with each vendor's lead time.
Sample data. Here the scrap allowance is added to the component's BoM quantity; actual scrap is recorded on the manufacturing order. Costing method, routes and lead times are agreed in discovery.
Three problems we see first.
BoMs in spreadsheets
Component lists live in Excel; when a price changes, the product cost doesn't.
Shortages found on the floor
Production stops because a component ran out that nobody knew was low.
Cost per unit unknown
Labour, materials and overhead never meet in one place; margin per product is estimated.
The apps we switch on.
All Odoo appsWhat changes with Odoo.
The same six jobs, done today and done in Odoo. Switch between them.
- Production planToday: Whiteboard updated by the plannerWith Odoo: Work orders scheduled on work center capacity
- Material shortagesToday: Found when the line stopsWith Odoo: Visible before the order starts, purchases raised
- Shop floor recordsToday: Paper travellers typed in laterWith Odoo: Quantities and time recorded at the work center
- TraceabilityToday: Searching through batch sheetsWith Odoo: Lots and serials traced from supplier to customer
- Quality checksToday: Clipboards filed in a drawerWith Odoo: Control points on receipts, operations and deliveries
- Product costToday: Estimated once a yearWith Odoo: Actual cost per manufacturing order
Output by work center, on one screen.
Every figure comes from the transactions your team already records in Odoo. These are the reports we set up first for manufacturers.
- Production analysis by work center and product
- Overall equipment effectiveness (OEE) per work center
- Cost analysis per manufacturing order
- Quality alerts and check results
| Output by work center | Planned |
|---|---|
| Cutting | 420 |
| Welding | 310 |
| Assembly | 360 |
| Painting | 260 |
| Packing | 280 |
| Output by work center | Done |
|---|---|
| Cutting | 398 |
| Welding | 296 |
| Assembly | 341 |
| Painting | 233 |
| Packing | 279 |
What your team will use.
An official Odoo video and screenshots of the apps in this setup. Press a screenshot to see it full size.
Odoo Manufacturing App Tour · official Odoo video
Screenshots and video © Odoo S.A., from odoo.com and Odoo's YouTube channel. TechNext is an Odoo Partner.
What Odoo 20 adds for manufacturers.
- Continuous production: record quantities on work orders so the next operation starts as soon as some units are ready
- Split an ongoing manufacturing order and produce the remaining amount later
- Compare bills of materials to see what changed, in PLM
- Scan a work center's barcode to select it on the shop floor, and see each vendor's quality rate
Three phases, one database.
Each phase goes live before the next one starts, so your team learns Odoo on work that already matters.
- Phase 1
Materials and production
- Bills of materials, operations and work centers
- Reordering rules and vendor lead times
- Opening stock counted in, with lots or serials
- Phase 2
Shop floor and quality
- Shop Floor tablets at each work center
- Quality control points and worksheets
- Preventive maintenance for key equipment
- Phase 3
Costing and planning
- Actual costing and stock valuation in Accounting
- Master Production Schedule from forecasts
- Engineering changes managed in PLM
For Philippine companies: BIR
For manufacturers in the Philippines, TechNext sets up Odoo Accounting for BIR requirements: books set up for your own CAS or CBA registration, 2307 certificates, SLSP, SAWT and QAP reports and, if you are a covered taxpayer (deadline 31 December 2026), a plan for e-invoicing. Your company registers its own books with the BIR, so we first check which rules apply to you.
Read Odoo in the Philippines and The BIR SLSP and how Odoo exports it.
Odoo for manufacturers, answered.
Does Odoo handle multi-level bills of materials?
Yes. Odoo supports multi-level bills of materials, kits, by-products and operations on work centers, and Odoo 20 adds BoM comparison in PLM.
Can operators use Odoo on the shop floor?
Yes. The Shop Floor app runs on a tablet at each work center, where operators see instructions, record quantities with barcodes and log their time.
How does Odoo calculate product cost?
Component costs, work center time and extra costs registered on the bill of materials roll up to each manufacturing order, and the stock valuation posts to Accounting.
Can Odoo trace lots and serial numbers?
Yes. Lots and serial numbers are tracked from receipt through production to delivery, and the traceability report shows where each one went.
Where does TechNext start with a manufacturer?
With one product family: its bill of materials, operations and components. Once it runs end to end, the rest of the catalogue follows.
Is Odoo BIR-accredited?
No software is BIR-accredited in that sense: the BIR registers your books and issues your Permit to Issue for the system you use, and its advisory of 14 September 2026 says it has not accredited any e-invoicing service provider. What matters is that your books, invoices and withholding meet BIR requirements. TechNext sets Odoo up for them and advises on what applies to your company. See BIR rules for your accounting system.
Can TechNext set up Odoo for BIR requirements for manufacturers in the Philippines?
Yes. Our Taguig City team configures Odoo Accounting for your own CAS or CBA registration, 2307 certificates, SLSP, SAWT and QAP reports and, for covered taxpayers, plans e-invoicing with you (any EIS connection is assessed and quoted separately). You file and register with the BIR yourself. Book a discovery call and an adviser reviews your current invoicing and books first.
Guides for this decision.
All articlesOdoo 20 release notes: what's new, in plain language
AI agents that run processes, an MCP connector for outside AI tools, offline mode, and the changes to check before upgrading.
Standard first: when to customise Odoo, and when not to
Configuration, Studio or custom code: what each costs at upgrade time, and five questions to ask before building anything.
Send us one product's BoM.
We map it, its routing and its cost in a discovery session — enough to scope the first phase.